Dry Ice Blasting “IS” State of the Art HRSG Tube Cleaning Technology. Dry Ice Blasting is a DRY Process that’s Non-Abrasive and does Not Create Secondary Waste. Dry Ice Blasting is Fast, Effective, and Saves Companies a LOT of Money on disposal Costs! Dry Ice Blasting is the Solution to HRSG Cleaning!
HRSG CleaningHRSG Before Co2 BlastingHRSG Before Dry Ice BlastingHRSG After Dry Ice Blasting
Emergency Response Cleaning is No Problem for Universal Dry Ice Blasting!Switchgear after CO2 CleaningSwitchgear after Dry Ice Blast CleaningSoot Covered Switchgear before Dry Ice BlastingSwitchgear After Dry Ice BlastingSwitchgear and Cables before Dry Ice Blast CleaningSwitchgear and Cable After Dry Ice Blast CleaningBusbar before Dry Ice CleaningDry Ice Blasting Switchgear BusbarThe Switchgear Cleaning was No Problem. Our Crew and the Electricians worked together harmoniously to get the Client up and running.
Dry Ice Blasting a Hydroelectric Generator StatorHydroelectric Generator Dry Ice BlastingHydroelectric Generator Stator Before Dry Ice BlastingWindings Before Dry Ice BlastingDry Ice Blasting Partially Cleaned Hydroelectric Generator StatorHydroelectric Generator Stator and Windings Cleaned With Dry Ice BlastingHydroelectric Generator after being Cleaned with Co2 Blasting and Painted
Hydroelectric Generator after being Cleaned with Co2 Blasting and Painted with Electrical Insulating Paint
Hydroelectric Generator Rotor and Field poles Before Co2 BlastingHydroelectric Generator Rotor and Field poles after Co2 Blasting and Painting
Hydroelectric Generator, Stator, Windings, Rotor, Co2 Blasting, and Painting Project
Co2 Blasting Turbine Case and BladesTurbine Case and blades cleaned by Dry Ice BlastingTurbine Case and Blades Before Co2 BlastingTurbine Case and Blades After Co2 BlastingLower turbine case being cleaned by Dry Ice BlastingLower Turbine Case Before Dry Ice BlastingLower Turbine Case After Dry Ice BlastingSide Lower Turbine Case Before Co2 BlastingSide Lower Case After Co2 Blasting
1st 2nd and 3rd Stage Turbine Wheel Before Dry Ice Blasting1st 2nd and 3rd Stage Turbine Wheel After Dry Ice Blasting1st 2nd and 3rd Stage Turbine Wheel Complete Using Dry Ice BlastingTurbine Generator Stator Before and After Dry Ice BlastingTurbine Generator Stator and Windings Before and After Co2 BlastingTurbine Generator Rotor Cleaned with Dry Ice Blasting